Case Studies
Solihull
From stage 3, Pre construction Planning discharge and Construction and fit out of 79,000sq ft storage industrial unit with 15,000 sq ft CAT B office fit out element on brown field site. Specialist storage facility fit out over 4 floors with goods lifts with extensive PV installation
- Client : The Store Room
- Contract Administrator : MAC Consulting
- Project Value : £5.8m
- Contract Type : JCT Design and Build
York House Hatfield
Extensive refurbishment and extensions to existing 1960s concrete framed building to provide additional office and retail space over three floors with CAT A and CAT B fit out. Challenges on site included, extensive piling and underpinning works due to poor ground conditions, extensive existing concrete frame repairs due to Carbonization and use of MMC techniques such as SIPS, pre fabricated stone work etc .
- Client : Hatfield House Estate Hatfield
- Contract Administrator : Elliott Pane
- Project Value : £2.8m
- Contract Type : JCT Inter with CDP’s
Eurohouse St Ives Cambs.
Complete stage 3 design , discharge outstanding planning conditions and Construction of 18,000 sq ft high bay industrial unit on occupied site. Existing site challenges, included maintaining operational use 24 hours / 7 days a week during the construction phase, contamination site conditions and the careful management of its removal within the project budget allowances.
- Client : Euro Group
- Contract Administrator : Lysanders
- Project Value : £1.6m
- Contract Type : JCT Design and Build
Park Royal London
Construction CAT B fit out and full removal and reinstatement of University 30,000 sq ft industrial unit to tight timescales
- Client : West London College
- Contract Administrator : Fusion Project Management Ltd
- Project Value : £1.8m
- Contract Type : JCT Design and Build
Luton, Bedfordshire – 7-Storey Storage Facility
MP Building Ltd has been appointed to deliver the construction of a 7-storey storage facility in central Luton, forming a key part of the town’s ongoing regeneration efforts. The project moves from Stage 3 (Developed Design) to Stage 4 (Technical Design/Construction), with MP Building responsible for translating design into build-ready specification.
With commercial sensitivities in place, specific project details remain under NDA. This project highlights MP Building Ltd’s role in supporting large-scale urban development and delivering modern storage infrastructure to meet future needs.